Published with Blogger-droid v1.6.7
Saturday, June 11, 2011
Tuesday, June 7, 2011
Flipping continued
| Back bedroom almost finished. Still have to do the silicone and trim | 
| This is the first project on the floor that Braden completed thst had special parts that that to be cut out. Great job Braden!  | 
| This is MOM's favorite room in the house. Can anyone guess what room this is? | 
| I believe this was behind the shower. Good thing they removed it. | 
| This is not the final look of the fireplace. It was just used to clear the sprayer of paint and will be completed at a later date.  | 
Monday, June 6, 2011
Worse than we thought
| Another picture of the kitchen. I love the way they have described they are going to change it. You will have to wait for a picture...sorry  | 
| Familyroom and the original look of the fireplace. MOD was going to have it removed, but I think we convinced him to keep it.  | 
| Master bathroom. the first to get gutted along with kitchen | 
| Back spare bedroom. The carpet was going to stay at this point so was rolled up as to not get painted.  | 
| First spare bedroom. Must have been a girls room with all that pink trim. | 
| The hallway bathroom before it was gutted | 
| This is where cabinets used to be. The insulation in attic will all have to be replaced. | 
| The cupboards had to go and then it was found that the pipes were not copper and the entire house has to be re-plumbed.  | 
| Before Braden edged and weeded. I did some weeding too but probably not enough to mention. | 
Subscribe to:
Comments (Atom)










