Saturday, June 11, 2011
Tuesday, June 7, 2011
Flipping continued
Back bedroom almost finished. Still have to do the silicone and trim |
This is the first project on the floor that Braden completed thst had special parts that that to be cut out. Great job Braden! |
This is MOM's favorite room in the house. Can anyone guess what room this is? |
I believe this was behind the shower. Good thing they removed it. |
This is not the final look of the fireplace. It was just used to clear the sprayer of paint and will be completed at a later date. |
Monday, June 6, 2011
Worse than we thought
Another picture of the kitchen. I love the way they have described they are going to change it. You will have to wait for a picture...sorry |
Familyroom and the original look of the fireplace. MOD was going to have it removed, but I think we convinced him to keep it. |
Master bathroom. the first to get gutted along with kitchen |
Back spare bedroom. The carpet was going to stay at this point so was rolled up as to not get painted. |
First spare bedroom. Must have been a girls room with all that pink trim. |
The hallway bathroom before it was gutted |
This is where cabinets used to be. The insulation in attic will all have to be replaced. |
The cupboards had to go and then it was found that the pipes were not copper and the entire house has to be re-plumbed. |
Before Braden edged and weeded. I did some weeding too but probably not enough to mention. |
Subscribe to: